Slurry pit emptying – MOBILIS

You have to store too much manure? Evacuation of your manure is too expensive? Land application sites are too far away or you don’t have enough land application areas? Use MOBILIS® solution, the only solution combining emptying of slurry pit and water and fertilizer extraction!

Rental or lease agreement possible. For services and options: contact us.

3 STEPS OF FILTRATION TO OBTAIN A PURE AND ODOURLESS WATER

1 / With the first step, the sieving phase extracts dry matter from manure and also a juice, sent to the next step;

2 / Sieving filtrate is then filtrated with ceramic modules of filtration, producing water and a first concentrated liquid fertilizer;

3 / Water from the filtration is purified by reverse osmosis, also producing a second concentrated liquid fertilizer.

Extraction of water from manure process

BEFORE MOBILIS

> Land application black-out periods must be respected
> 5 400 tonnes/year of manure spread
> Significant storage and transport costs

AFTER MOBILIS
> Land application reduced and targeted
> Slurry pit emptying all year without interruption
> New income (fertilizer)

STRENGTHS OF MOBILIS

• Slurry pit emptying possible all year long
 Protection of water resources, for a more sustainable agriculture
• P&P unit easily connected to the existing pipes
• 
Water extracted 100% reusable or compatible with a release in the natural environment
• 
Mobile equipment that can move between several sites

YOUR PROJECT

Are you looking for an economical solution for slurry pit emptying? Send us your project by filling this form. You will shortly receive our estimate budget.